Large Tilting Furnace - Aluminum
This furnace was constructed to give a 90-100 lb pour capability is is based on the design by Steve Chastain. The page numbers on the build sequence chart reference his book, the sequence in the book it not very logical so this is the build order I used.
The following tools were used in the construction of this furnace
- 12" lathe
- Welder, AC/DC
- Oxygen/Acetylene Cutting torch
- bandsaw, power
- hacksaw, hand
- 9" and 4" handheld weld grinders
- jigsaw
- drill press, morse taper, 1" bit
- air die grinder with 5hp compgressor
If you don't have access to these tools, something close or friend with them, the project will be difficult to complete.
Finished Furnace
Link for pics showing melting and crucible
Pictures and chart showing sequence of build
© CSW 2008